Rockcastle County Road Department

Road Department Mowing Roads

 

 

 

 

 

 

 

Rockcastle County Road Department will be out mowing the roads this summer.  Please be aware of county tractors and mowers and proceed with caution.

Rockcastle County Road Department located at:

2528 South Wilderness Rd
Mt. Vernon, KY 40456
606-256-2956

Duties of the Rockcastle County Road Department include:

Mowing
A mowing crew consists of teams of tractors who work in different areas of the county mowing the right-of-ways.  The mowing crew also has a boom mower that will be maintaining grass, trees, or other obstacles around any bridges and guardrails.  The county follows and repeats a mowing schedule on a monthly basis from May thru September.

Trimming Trees
A tree trimming crew ensures low hanging limbs, or  invalid trees do not block the right-of-ways.  This crew will also prevent any future problems concerning the blocking of roadways if necessary.

Maintaining a Fleet of County Equipment
The maintenance shop services the county owned equipment and department vehicles.

Repairing and Installing Road Signs
A sign repair crew repairs or replaces county signs as needed to ensure safe travel for the residents of the county.  The sign crew is also required to maintain the visibility of each sign which may require tree or occasional brush trimming.

Snow and Ice Removal
The Rockcastle County Road Department is responsible for snow and ice control on county maintained roads.  The Road Department removes snow and ice in order of priority.  There are priority roads, secondary roads that may be part of, or lead to, a subdivision, and subdivision roads.  The priority roads for snow removal were developed by identifying a basic system or roads essential to the continuation of traffic movement.  The objective of the Road Department is to provide winter roadway safety to the traveling public in the most reasonable, efficient and effective manner.  The amount of snow, the type of snow and/or ice, and the duration of the storm affect the time it takes to complete work on each priority road.  Therefore, a specific completion time cannot be given.